FR | EN | AR
Children's Hospital Access Traffic Studies.
SD, DD, and TD studies files relating for the construction of 2x3 lane road on National Road 7.
Detailed preliminary design and execution studies for 140 km of roads.
Technical, socio-economic, environmental, social and TD studies.
Execution studies for the SFAX-GABES motorway diversion on the RN2.
Detailed technical studies of the Kaga Bandoro – Mbres – Bamingui road.
Execution studies of the FOUMBAN-MANKI road with a length of 40 km.
Execution studies for reinforced concrete structures on the NGAOUNDERE-GAROUA road (300 km).
Execution studies relating to the rehabilitation works of the BAMBARIE-LIOTO track with a length of 94.6 km.
Technical and economic feasibility studies for the rehabilitation of 250 km of roads .
Control mission of the construction works of 2x2 lanes on the RR27 with 19 Km of length.
Detailed technical studies of 57 km of tracks as part of the agricultural and rural development project around the hill lakes (DARAL).
Study of the traffic plan of the mother and child hospital in Ariana.
The execution studies of the 51 km BOULI-SELIBABY-Lot 6 bis 1 road.
Studies of the SD, DD, and TD of the duplication of LR 458 in the governorate of Manouba.
Rehabilitation study of the RN1 from PK0+00 to PK 5+205.
12