EDC is responsible for the execution studies of the 140 km road including two bridges, the Tiendaga Bridge of 45 m and the Kankela Bridge of 80 m and 160 hydraulic structures :
Batch 1: Zantiébougou-Kolondiéba - Bessina with a length of 75,000 km.
Batch 2: Bessina- Kadiana- Ivory Coast border of 64.217 km.
Services provided by our team :
Topographical, geotechnical, structural, drainage, and hydraulic work studies.