2X2 LANES OF THE RR27 NABEUL


Control mission of the construction works of 2x2 lanes on the RR27 with 19 Km of length.
Project title :
2X2 LANES OF THE RR27 NABEUL

MEHAT-DR NABEUL

Road

Tunisia

2019 - 2022
EDC is in charge of the control, monitoring, and technical assistance of the work to create 2x2 lanes on the RR27 between Nabeul at KP 27 and  Korba at KP 46 with a total length of 19 km.