Execution studies of the FOUMBAN-MANKI road with a length (25 km) including the NCHI bridge of 40 m.
The services provided by our staff are generally:
Topographic studies, engineering structure studies, drainage studies, hydraulic
structure studies, road studies, and protection studies.