Technical studies and monitoring of the construction of earthen dykes and basins of the GINOR sugar factory
Project title : CONSTRUCTION OF DIKES FOR THE GINOR FACTORY
GINOR
Drainage & Feed water supply
Tunisia
2019 - 2020
EDC is in charge of the development studies for the sugar factory, including the construction of earthen dykes over 6 hectares, the drainage of rainwater, and the construction of two basins with a total of 6,000 m3.