The project consists of carrying out the in-depth inspection mission of six (6) bridges on the NR 3, RR28, RR134 and RR35 roads in the governorate of Zaghouan.
*OA1 is on the departmental road RR35 at PK 41+400 on Oued MALEH.
*OA2 is on the departmental road RR35 at PK 41+550 on Oued HAMMAM.
*OA3 is on the RN3 departmental road at PK 96+450 on Oued SAADIN.
*OA4 is on the departmental road RR28 at PK 75+900 on Oued SMAR.
*OA5 is on the departmental road RR133 at PK 40+950 on Oued ELKENZ.
*OA6 is on the departmental road RR134 at PK 9+200 on Oued SIDI HMMIDE.
The project composed of:
- Auscultate and diagnose the structural condition of these structures;
- Propose maintenance solutions;
- Development of an estimated detail and a price schedule for maintenance and upkeep work.
The studies are split into two phases:
- Phase 1: Preparation of an inspection report, diagnosis (auscultation and tests) and recommendations.
- Phase 2: Preparation of a tender dossier for the repair or replacement of the structure.