SEABOARD PROTECTION CAP ZEBIB BIZERTE


Study of protection of a section of the seaboard in Cap Zebib.
Project title :
SEABOARD PROTECTION CAP ZEBIB BIZERTE

DGSAM/MTM

Ports & development of stretch of coastline

Tunisia

2021 - 2022

EDC is in charge of the execution studies relating to the works to protect a section of seaboard against marine erosion at Cap Zebib in the governorate of Bizerte.

This project concerns the work of:

- Execution of a rockfill dike for the protection of the existing slope, The coating of the upper part of the dike;

- Construction of reinforced concrete retaining walls;

- Installation of a riprap cord for the protection of the foundations of the retaining walls, the recovery and extension of the existing roadway;

- Execution of a rainwater drainage system for the paved area as well as the discharges necessary for the evacuation of this water into the sea;

- The execution of reinforced concrete stairs to allow visitors access to the beach;

finally The extension of the catchment pipes of the natural water sources, located in the section to be protected;

Services provided by our team :

Topographic, geotechnical, geometric studies of roads, structures, drainage, and bank protection.