REHABILITATION OF THE RR46 AND CONSTRUCTION OF A BRIDGE OVER WADI MAAROUF


Studies of executions of a bridge on Wadi MAAROUF at the level of PK 60+475.
Project title :
REHABILITATION OF THE RR46 AND CONSTRUCTION OF A BRIDGE OVER WADI MAAROUF

GLOULOU/DREH KAIROUAN

bridges

Tunisia

2021 - 2022
EDC is responsible for the execution studies relating to the construction of a bridge over Wadi MAAROUF at KP 60+475 and the rehabilitation of 12.3 km of the RR46 road from KP 59+500 to KP 71+800 in the governorate of Kairouan.

Services provided by our team:

Hydraulic studies, engineering structure studies, drainage studies, hydraulic structure studies, road studies, and protection studies.