In-depth inspection of a
bridge on the track linking Khnis to Monastir at Oued Melah in the governorate
of Monastir.
The project consists of:
- Auscultate and diagnose the structural
condition of these structures;
- Propose maintenance solutions;
- Development of an estimated detail and a
price schedule for maintenance and upkeep work.
Following the terms of reference, the studies will be split into two distinct phases :
- Phase 1: Preparation of an inspection
report, diagnosis (auscultation and tests), and recommendations.
- Phase 2: Preparation of a tender dossier
for the repair or replacement of the structure.