BRIDGE OVER WADI CHAOUT MANOUBA


Execution studies of crossing work on Wadi Chaouat on NR7.
Project title :
BRIDGE OVER WADI CHAOUT MANOUBA

EKK/DREH MANOUBA

bridges

Tunisia

2021 - 2022
EDC is in charge of the execution studies relating to the construction works of a bridge on Oued Chaouat over the NR7 at  24+180 KP in the governorate of Manouba.

Services provided by our team:

Hydraulic studies, engineering structure studies, drainage studies, hydraulic structure studies, road studies, and protection studies.