EDC is in charge of the execution studies of the bridge between SAINTE RITA and FIFADJI 60 m including, 200 m of retaining walls, 25 hydraulic structures, and 3 km of roads.
Services provided by our team:
Topographic, geotechnical, and geometric studies of the road, structures, drainage and bank protection.