EDC is responsible for the rehabilitation studies of LR 505 from KP 0 to KP 03+500 and the replacement of two (02) structures on Oued Besmat at KP 01+700 and KP 02+300 in the governorate of Manouba .
The study is carried out in two phases:
1st phase: Summary pre-project study, economic feasibility and environmental impact,
2nd phase: Detailed technical studies and preparation of tender documents.
Services provided by our team:
Topographical, geotechnical, geometric studies of the road, structures, drainage and protections.