Detailed technical studies relating to the design of a water tower in Guinebor with a capacity of 2000 m3
Project title : GUINEBOR WATER TOWER
CGCOC GROUPE
Drainage & Feed water supply
Chad
2021 - 2022
EDC is in charge of the detailed
technical and execution studies relating to designing a water tower in
GUINEBOUR in Chad with a capacity of 2000 m3 including related works (operating
buildings, housing, and pumping room).