EDC is in charge of construction studies of two bridges over Wadi BASIKH on the RR26 at KP 16+970 and KP 17+065 in the governorate of Nabeul.
The study is fulfilled in two phases :
1st phase: Summary pre-project study, economic feasibility, and environmental impact,
2nd phase: Detailed technical studies and preparation of tender documents.
Services provided by our team:
Topographic, geotechnical, and geometric studies of the road, structures, drainage, and protections.