EDC is in charge of the execution studies relating to the construction works of a hydraulic structure over regional roed RR96 at 26 KP in the governorate of Mahdia.
Services provided by our team:
Hydraulic studies, engineering structure studies, drainage studies, hydraulic structure studies, road studies, and protection studies.