EDC is in charge of the construction studies of the two bridges over Wadi HARBIA on the RR 52 at KP 25+100 and over Wadi HAMAM on the NR 7 at KP 127+850 in the governorate of Beja.
The study will be carried out in two phases:
1st phase: Summary pre-project study, economic feasibility, and environmental impact,
2nd phase: Detailed technical studies and preparation of tender documents.
Services provided by our team:
Detailed technical studies; Geometry and development technical norms, hydrogeology –Water resources, hydrology, and hydraulics, civil engineering works, geotechnical study, road signs and markings, preliminary estimates of quantities, plans preparation, works preliminary estimates, allotment, and program of works execution.